Tuesday, February 28, 2017

Final Metal

The crew and all their equipment is gone, so these are our first pictures without big equipment blocking the building.




The only thing left to have the building closed-in are the doors.  They should be installed next week, but the wide roll-up doors still haven't been delivered.




The crew left windows open in the cupola.  Now they are gone, with their lift and ladders.  I have no idea how we are going to close those windows.

Edited 3/8/17 to show you how Marvin and his brother solved this problem and got the windows closed.


My brother-in-law took this picture and showed it to me afterward.  If I had been there, I probably would have had a heart attack watching Marvin climb that ladder.

No comments:

Post a Comment